Referentieprojecten
In this project, processing the earthing stud was carried out by a 4 column press (manual workstation) for pressing the stud into the car's wheel house. The customer part was not pre-punched.
In the press-in machine, the studs were sorted in a bowl feeder, separated and fed one-by-one into the setting head. Customer parts were inserted manually into the machine and positioned under the setting head. The press-in process was started via the 2 hand control.